Completed Projects
WORLD BANK FUNDED PROJECTS
  • Upgrading Kanchipuram - Vandavasi Road (SH 116) km 14/300 - km 36/700 and Sadras – Chengalpattu - Kanchipuram - Arakkonam - Thiruthani Road (SH 58) km 0/000 to km 26/811.
  • Upgrading Arcot - Villupuram Road (SH 4) km 29/000 to km 110/165 and km 113/325 to km 114/600.
PWD - GOVENMENT OF TAMILNADU
  • Strengthening and Improvements to km 0/0 – 10/0 & km 40/0 - 60/700 including reconstruction of narrow and weak culverts, providing paved shoulders in km 9/200 – 9/80, providing central median in km 56/200 – 60/700 including road safety items on NH234 (new no.NH-75), improvements of sharp curves by providing cc p km 0/00 – 2/400, providing crash barriers from km 0/0 – 2/400 of nh234 (new no. NH-75)
  • Widening intermediate lane to double lane and strengthening in km 0/0 - 19/8 of Arani - Padavedu road (MDR)
  • Package 4- Strengthening and Improvement works in Chennai city roads (H) tambaram(H) C&M sub division jurisdiction
  • Package 2 - Improvement, Strengthening, Junction Improvement and Retaining wall works in Katpadi (H) C&M Sub Division Jurisdiction-intimation
  • Formation of flood bank and improving drainage facilities to gadilam river from Kammatchipettai village to Naduveerapattu village in Cuddalore district (Package no.3)
  • Flood Protection Works in left bank of kollidam (Coleroon) river from l.s. 155.51 km to 162.61 km in Chidambaram taluk of Cuddalore district in Tamil nadu, Package no.20
  • Package no. 23 / Tniamwarm / wrd / chr - klr / works / iv / 2010-11 - rehabilitation and modernisation of all tanks and supply channels in Cheyyar - Killiyar sub basin in Acharapakkam, Chittamur and Maduranthagam blocks of Kancheepuram District
  • Package : 04 Rehabilitation and Modernisaton of System tanks & non system tanks and Supply Channels covered under Coovum sub basin in Kadambadur block of Kadambadur Taluk in Thiruvallur b1:b4
TNRDC - (TAMIL NADU ROAD DEVELOPMENT CORPORATION LIMITED)

Widening of East Coast Road (ECR) from Double Lane into Four Lane from KM 22/300 to KM 55/800, Including Improvement to Curved Stretches – 13 Nos & Junctions-7 Nos from KM 55/800 to KM 135/500 in Chennai, Tamil Nadu

TNRIDC - (TAMIL NADU ROAD INFRASTRUCTURE DEVELOPMENT CROPORATION)

mprovements from Four laning to Six laning of Vandalur – Wallajabad Road (SH-48) km 30/400 – 47/000 including Land Acquisition for formation of Padappai Bye Pass (Phase-IV) and including two laning to four laning of Vandalur - Wallajabad road km 30/830-31/300 (Balance work in Phase –I).

OTHER PROJECTS
  • Package 8- Improvements, Construction of Culvert, Construction of Centre median and Reconstruction of Narrow Culverts in Katpadi (H) C&M Sub Division Jurisdiction
  • Strengthening of GNT Road at Km 0/8-3/2 (LS & RS) including Drain & Platform and White Topping in Km 4/8-5/0 (SHU-87) (Job Code 01-CRIDP-14-15-S-0005)
Ongoing Projects
IRRIGATION & WATER RESOURCES PROJECT - ASIAN DEVELOPMENT BANK FUNDED
  • Infrastructure Improvement and Reconstruction works on Vellaiyar river from 111.650 km to 153.650 km
  • Desilting and Deepening the Bed of Veeranam tank from VNSS to Radha sluice (l.s. 0 to 9.00 km) in Kattumannar koil and Chidambram Taluk of Cuddalore District (Package - I)
  • Removing Shoals of Veeranam Tank from south side of Radha Sluice to Infall Regulator (L.S. 9.00Km to 15.00Km) and Rehabilitation of its supply source Vadavar Channel in Kattumannar koil and Chidambram Taluk of Cuddalore District (PACKAGE - II)
  • Improvements and Construction of Drain, Footpath in Km11/0-17/- of Inner Ring Road in Selected Stretches Including Widening of Existing Road for 6m Width(Ave)Both Side and Strengthening 800m In Km 16/5-17/1(Left Side) (SH02)
IRR PROJECT

Improvements and Construction of Drain, Footpath in Km11/0-17/- of Inner Ring Road in Selected Stretches Including Widening of Existing Road for 6m Width(Ave)Both Side and Strengthening 800m In Km 16/5-17/1(Left Side) (SH02)

Projects in Pipeline
NATIONAL HIGHWAYS AUTHORITY OF INDIA
  • Sriperumbudur to Karaipettai from Km. 37.000 to Km. 71.015 of NH-4 (New NH-48) in the state of Tamil Nadu under residual NHDP (Phase-V) under Bharatmala Pariyojana on EPC Mode.
  • Construction of Four-Lane divided Highway from Melur (Design km. 0.000/Existing km. 99.920 of NH-38) to Karaikudi (Design km 45.855 /Existing km. 12.900 of NH-383 Ext.) (Design Length- 45.855 km) in the State of Tamil Nadu under Bharatmala Pariyojana on EPC mode.
KARNATAKA ROAD DEVELOPMENT CORPORATION LIMITED

Development of road from Kanchugaranahalli to jigani via Harohalli and Urgandoddi (Km 0+000 to Km 33+200) and section of road from BM road junction to Coca Cola factory (Km 0+000 TO Km 3+000) of Bidadi-Harohalli road in Bengaluru urban/rural district (Package-3A)

Do you have any projects?
Contact us.

Contact Us